Insight · 2 min read
One Is None
Every few years, something closes the only door you have.
In February 2021, a winter storm froze the Texas Gulf Coast. Within days, plants making 80 to 85% of America’s polyethylene and polypropylene, two of the most common plastics in molded parts, had shut down.
Molders ran short of resin. Polypropylene rose 33 cents a pound in a single month. Several producers declared force majeure, the clause that says, in effect, “we can’t, and it’s not our fault.”
The buyers who got through it weren’t the ones with the lowest price. They were the ones with somewhere else to go.
A month-long disruption every 3.7 years
How often
A disruption lasting a month or more
Every 3.7 yearson average
What it costs
Over a decade, for the average company
40%+of a year’s profit
Source: McKinsey Global Institute, Risk, resilience, and rebalancing in global value chains (2020), via SupplyChainBrain.
Most buyers will live through two or three of them in a decade. What each one costs depends on whether a second supplier is already approved.
Six shocks in five years
COVID-19
Factories, ports and borders close around the world
2020
Winter storm
Most US polyethylene and polypropylene production shuts
2021
Ever Given
One ship blocks the Suez Canal for six days
2021
Shanghai lockdown
Trucks stop and containers pile up at the world’s busiest port
2022
Panama Canal drought
Too little water, so the canal cuts daily crossings for months
2023
Baltimore bridge
A collapsed bridge shuts a major US port’s channel for 11 weeks
2024
Sources: PlasticsToday; Plastics Technology; Argus; gCaptain; Al Jazeera; Global Trade.
Each one hit somebody who had a single supplier for a part they couldn’t do without.
What a second source takes
It isn’t a replacement
Keep the supplier that works. A second source adds a door; it doesn’t close one.
It’s somewhere else
A second supplier down the road shares the first one’s storms, ports and tariffs. One in another country has its own.
It has shipped before
A quote in a drawer isn’t a second source. A supplier that has made your part, passed your approval and shipped real orders is.
It starts with one part
It takes a second mold and an approval, so begin with the part that would hurt most if it stopped.
In the 1980s, nobody got fired for buying IBM. Then the safest name in business lost money three years running. One supplier is a price. Two is a plan.
Looking for a second door?
Send the part you’d least like to run out of. We’ll show you what a second source for it would look like.