Two quotes for the same part can be far apart because of what the request left out. Nine things that make a quote real.
On September 23, 1999, NASA lost the Mars Climate Orbiter, a $125 million spacecraft, as it arrived at Mars.
The cause fit on one line. Software on the ground reported the thrusters’ push in pound-force seconds. The spacecraft expected newton-seconds. Both teams were good at their jobs. Nobody had written down which unit they meant.
Each thruster firing, as the software assumed it and as it was
One pound-force second is 4.45 newton-seconds, so every firing pushed the spacecraft 4.45 times harder than its navigators’ software assumed. Source: NASA’s mishap investigation, via SimScale.
Requests for quotation go wrong the same way. Every gap forces the supplier to guess, and every guess moves the price.

One supplier assumes a cheaper plastic. Another assumes one cavity instead of four. A third leaves out the machining. The quotes look comparable, and they aren’t.
Nine things that make a quote real
The drawing and a 3D file
A 2D drawing with tolerances, plus a STEP file. Without them, a quote from a photo is a guess.
The material, by grade
For example “PA66, 30% glass-filled”, and the producer if it matters to you. Without it, the supplier picks a grade, often the cheapest one that might work.
How many, and how often
Annual volume and typical order size. Without them, nobody can size the mold, and the number of cavities in the mold drives the part price.
The dimensions that matter
Mark the critical few. Without that, the supplier has to guess which ones matter, and you pay for the guess.
Color and finish
A color code and the surface texture. Without them, the quote assumes standard black and a standard finish.
Anything after molding
Inserts, machining, assembly, printing or labels. Without them, the quote covers molding only and the rest arrives later as a surprise.
How it should be packed
Bulk cartons, bags or trays, and any labels. Without it, the quote assumes bulk cartons.
Where it’s going
The destination and the delivery terms you want. Without them, the supplier quotes its standard terms.
When you need it
Dates for samples and for the first production order. Without them, you get the standard lead time.

Don’t have all nine?
Send what you have. A good supplier will tell you which gaps change the price and which don’t, and will write down every assumption on the quote, so you can compare like with like.
Copy this into your next RFQ
Part name and number:
Drawing and 3D file:
Material grade (and producer):
Annual volume and order size:
Critical dimensions:
Color and finish:
Work after molding:
Packing and labels:
Delivery address and terms:
Sample and production dates:
The orbiter was lost to one assumption nobody wrote down. A good request writes them all down.