Insight · 4 min read
Decided Before the First Shot
In 1950, an American statistician told Japan’s factories to stop relying on inspection. On a molded part, quality is decided in four places before anyone inspects it.
In the summer of 1950, an American statistician named W. Edwards Deming stood in front of Japan’s industrialists and told them to stop depending on inspection.
By the time you inspect a part, he argued, its quality has already been decided. Inspection can catch some of the bad ones. It can’t make good ones. Japan’s manufacturers took him at his word, and within a generation “made in Japan” meant something new.

Inspection checks a sample: a couple of hundred parts out of thousands. It’s the final check, not the thing that makes the parts good. That happens earlier, in four places.
1. The plastic
A drawing might say “nylon 66.” There are hundreds of nylon 66 grades, and they don’t behave the same. Swap one for a cheaper one and the part looks identical on the day it ships. The difference shows up months later, when it cracks.
That’s why the plastic should be named on the quote, grade and producer, and why every bag should come with the producer’s certificate.

2. The settings
Almost every defect on a molded part has a cause you can name. A burn mark means trapped air got hot enough to scorch the plastic. A short shot means the plastic ran out before the mold was full. Flash means it squeezed out where the two halves of the mold meet. A sink mark means a thick section shrank as it cooled.




Most of them trace back to a temperature, pressure or time that drifted from the settings that made the approved samples, or to a mold that has worn. So the first approved parts matter twice: every cavity should be measured against your drawing, and the settings that made those parts should be the settings used on every run after.
3. Room to spare
One good sample proves a part can be made once. What you need to know is whether it can be made the same way every time.
Engineers measure that with a number called Cpk, and the easiest way to picture it is a car in a garage. The garage is your tolerance. The car is the natural variation of the process. If the car just fits, it scrapes a wall now and then. The more room on each side, the fewer parts miss.

How often a part misses its tolerance
Bar lengths are to scale. For a centered process with a normal spread. In automotive supply, Cpk 1.33 is the usual minimum for parts in production and 1.67 for a new part’s first study (AIAG PPAP manual).
Car makers expect room on each side for parts already in production, and room to open the doors for a new part. Ask for the Cpk on the few dimensions that matter most to you.
4. A trail back from every part
If a problem appears months later, traceability decides how big it is. When a supplier can tie a part to the day it was molded and the bag of resin and batch of color that went into it, the recall is a few boxes. Without that trail, it’s everything they’ve shipped.

Four questions for any supplier
Which plastic, exactly?
The grade and producer by name, with the producer’s certificate for every lot.
Is every cavity measured?
Yes, against your drawing, before production is approved.
What’s the Cpk?
A number for each of the few dimensions that matter most to you.
What can one part tell you?
Send one back, and they can name the day it was molded and the material that went into it.
Ask us these questions too. We’d rather answer them before your first order than after it.
Deming’s point was that by the time you inspect, it’s too late. The parts that reach your door were decided before the first shot.
And if something still goes wrong, somewhere you can’t control?

Have a part in mind?
Send a drawing or a sample with the dimensions that matter most, and we'll explain how we'd control each one.